1. Water well drilling rig operators shall receive training and guidance from the manufacturer, have a full understanding of the structure and performance of the rig, and obtain certain experience in operation and maintenance before operating the machine. The product operation and maintenance manual provided by the manufacturer is the necessary information for the operator to operate the equipment. Before operating the machine, the operator must read the operation and maintenance manual first and carry out operation and maintenance according to the requirements of the manual.

2. Water well drilling rig pay attention to the working load in running-in period, the working load in running-in period should not exceed 80% of the rated working load, and should arrange the appropriate workload, to prevent the occurrence of overheating caused by continuous operation of the machine for a long time.

3. Water well drilling rig pay attention to frequently observe the indicator of each instrument, abnormal, should be promptly stopped to eliminate, in the cause is not found, the fault is not removed, should stop the operation.

4.Water well drilling rig pay attention to the regular inspection of lubricating oil, hydraulic oil, coolant, brake fluid and fuel oil (water) level and quality, and pay attention to check the tightness of the whole machine. It is found that there is too much oil and water in the inspection, the reason should be analyzed. At the same time, should strengthen the lubrication of each lubrication point, it is recommended in the run-in period, every shift to the lubrication point with grease (except special requirements).

5. Keep the machine clean, adjust and tighten the loose parts in time to prevent the loose parts from being worn out or missing.

6. At the end of the running - in period, the machine should be maintained compulsivly, check and adjust, and pay attention to the replacement of oil.

In short, the maintenance requirements of the well drilling rig during the run-in period can be summarized as: reducing load, paying attention to inspection, and strengthening lubrication. As long as pay attention to and according to the requirements of the implementation of the construction machinery running-in period of maintenance and maintenance, will reduce the occurrence of early failure, extend the service life, improve the efficiency of the operation, for you to bring more economic benefits.